get in touch

Tsunami protection, Kelian pit, Indonesia

THE PROJECT

The tsunami (wave) protection bund at the Kelian Equatorial Mining gold mine, in East Kalimantan, Indonesia was constructed to protect river communities. The project comprised a 1 km long and 15 m high earth and rockfill embankment, along the open-pit crest. The pit was flooded post closure. The bund design was intended to prevent an overtopping tsunami (wave), generated from a pit wall failure, from entering the Kelian River and flooding downstream villages.

PSM was engaged to provide geotechnical studies to assess probability and risk associated with in-pit failures generating over-topping waves in the post-closure flooded pit lake. PSM was also responsible for developing hydrology (flood) studies to assess required embankment heights and providing geotechnical engineering design and development of for-construction drawings of all required works.

ENGINEERING AND TECHNICAL OPPORTUNITIES

The Kelian gold mine is located in a remote region of Borneo, approximately 2 km south of the equator. The area experiences high annual rainfalls of between 3-4 m and challenging terrain. An over-topping tsunami would threaten Kelian River communities. Floodwaters pose a risk to mine closure works to reduce contamination level in onsite and discharged effluent waters.

Engineering and technical opportunities included:

  • Post-closure pit flooding to reduce the potential for acid mine generation from exposed pit slopes
  • Assessment of the probability and consequences of pit slope failures generating a tsunami in the pit lake
  • High equatorial rainfall resulting in an estimated PMF of 3,300 cumecs at velocities > 5 m/s in the steeply incised Kelian River valley.

APPROACH AND INNOVATION

Following rigorous assessment and modelling, PSM’s tailored approach included:

Conceptualisation of the tsunami problem, assessment of risk and development of proposed strategies
Flood studies to establish required embankment heights and freeboard requirements
Installation of a conduit to drain flood waters from low-lying ground between the embankment and the Kelian River back into the pit using engineered sodium bentonite and gravel material to prevent seepage and possible piping failure around the conduit.

OUTCOMES

The project fulfilled the dual function of protecting the Kelian River from pit tsunamis and preventing floodwaters from entering the pit and damaging mine closure engineering works. The combination of geotechnical engineering design of an earth and rockfill embankment with hydrological assessments of flood height enabled the mine to continue operating.

Services: #embankment #equatorialgoldmine #flood #geotechnicalstudies #hydrology #Indonesia #kelitan pit #kelitanriver #postclosure #tsumaniprotection

Kelitan Pit Tsunami

get in touch

Contact Us

For expert advice, reach out to our team today.

    SUBSCRIBE TO STAY IN TOUCH

    Receive the latest news and updates straight to your inbox.
    footer certificationfooter certificationfooter certification
    Technically Assured Organisation
    Locations

    Sydney

    G3, 56 Delhi Road
    North Ryde NSW 2113

    BRISBANE

    Level 6, 500 Queen st
    Brisbane QLD 4000

    PERTH

    Level 3, 22 Delhi st
    West Perth WA 6005

    GEELONG

    O16, L4, 60 Moorabool St
    Geelong VIC 3220
    Contact us
    Locations

    Sydney

    G3, 56 Delhi Road
    North Ryde NSW 2113

    BRISBANE

    Level 6, 500 Queen St
    Brisbane QLD 4000

    PERTH

    Level 3, 22 Delhi St
    West Perth WA 6005

    Geelong

    O16, L4, 60 Moorabool St
    Geelong VIC 3220
    Contact us
    Footer Certification
    Footer AEC logo